AS 4687 Temporary Fencing Rental for Civil Projects

November 23, 2026•5 min read
AS 4687 Temporary Fencing Rental for Civil Projects

Not all worksites are created equal. Different weather conditions and soil types can affect the type of fencing required for AS 4687 compliance. Civil construction sites can require different fencing configurations depending on wind exposure, ground conditions and the surrounding environment. 

Urban environments are straightforward, with basic configurations generally being sufficient. However, if you’re dealing with an exposed coastal zone, elevated hillside or high-wind area, you’ll need a reinforced system. The panels, footing, support systems and bracing must all work together as a complete system.

Lok-Fence & Wind-Lok Multibrase are Sitetech’s solution to wind exposure and additional stability requirements. It can handle wind pressure from both directions, meeting the new dual-sided testing requirement.

Do Shade Cloth, Mesh and Signage Affect AS 4687 Temporary Fencing?

Attaching shade cloth, privacy mesh, printed banners or signage can alter the wind loads experienced by temporary fencing. Because of this, attachments should be considered part of the complete fencing setup and not automatically added after installation without first assessing their impact.

What Should You Check Before Hiring AS 4687 Compliant Fencing?

Civil construction teams must evaluate the proposed fence configuration against AS 4687 and project-specific specifications. Before hiring and installation, you should assess:

  • site conditions

  • ground conditions

  • wind exposure 

  • screening or signage (impact on wind loads)

  • access requirements

  • safe installation requirements

Project teams need to understand what documentation or information supports the fencing system being proposed. Always request engineering certificates and test reports from the fencing supplier to verify the setup complies with AS 4687.

Sitetech can check your site requirements and supply the appropriate fencing setup. We also deliver, install and collect the system once the hire period ends.

How Should Temporary Fencing Be Managed During an Infrastructure Project?

Temporary fencing on civil construction projects may remain in place for an extended period while the site continues to change. This includes situations like altered fence lines, changing access points, staged works, damage, new screening or signage and significant weather events.

Changes should be reviewed in the context of the complete fencing system rather than treating individual panels separately. SiteTech can provide ongoing servicing and make adjustments or extensions during the hire period.

How to Plan Your Temporary Fencing Requirements 

The right setup depends on the individual infrastructure project rather than a one-size-fits-all fencing configuration. Establish your project’s compliance obligations and site-specific requirements first. Identifying the correct AS 4687 standards for your application is paramount to meeting all safety and legal benchmarks.

Then you can begin evaluating your product options. Document all relevant site conditions before speaking with your temporary fencing supplier. Be sure to record the ground conditions and topography, local wind exposure and any plans for shade cloth, mesh or signage. Soil testing may be required.

We recommend contacting Sitetech Solutions directly to discuss the specifics of a project in greater detail. SiteTech can assess, supply, deliver, install and service AS 4687 compliant fencing hires.

FAQs

What is the current Australian Standard for temporary fencing?

The current standard is AS 4687:2022, with Parts 1, 2, 3 and 4 being the most relevant to compliant temporary fencing rental.

Is AS 4687:2007 still current?

AS 4687:2007 has been superseded by the AS 4687:2022 series. However, older websites or documentation may still reference the previous edition.

Does temporary fencing need to comply with AS 4687 on infrastructure projects?

AS 4687 is the relevant Australian Standard for temporary fencing. Although specific project obligations can also depend on WHS requirements, contracts, project specifications and jurisdictional requirements.

Does adding shade cloth or signage affect temporary fencing?

Attachments may change the wind forces acting on the fence and may affect the required setup. We recommend checking planned attachments with the supplier or relevant engineer.

Does AS 4687 cover temporary hoarding?

Yes, the AS 4687 series includes temporary hoardings. For more information on temporary hoarding requirements, AS 4687.3:2022 is the relevant part to look at.

What should I ask a temporary fencing supplier before hiring?

Ideally, you should have a list of questions and topics to cover with the fencing supplier. These should include the proposed fencing configuration, relevant AS 4687 information, site conditions, installation requirements, supporting documentation and ongoing servicing requirements. 

We also recommend discussing planned attachments with the fencing supplier before installation.

 